Just like many professionals in the UK, architects value clear guidelines to help them do their job better. The RIBA Plan of Work 2020, from the Royal Institute of British Architects, is an essential guide for the UK building sector. Created in 1963, it has been updated over time, with a major update in 2020 to reflect modern building practices and sustainability goals. This article breaks down the eight main steps in this guide. Though it’s not a legal contract, it offers important advice on designing, building, and using a structure. Each step has specific goals, tasks, and critical details to ensure the project moves smoothly to the next phase.
Mill Hill House – a new build home in Mill Hill, North London
Introduction to RIBA Plan of Work 2020:
The RIBA Plan of Work: A process roadmap that has its roots going back to 1963. It was designed to guide architects through client projects, ensuring clarity at each stage of the process.
Why it’s essential: It standardises procedures, ensuring that architects, clients, and collaborators are always on the same page.
The 2020 Update: This was its most significant revamp. Key considerations included:
- Incorporating digital advancements
- Ensuring ethical approaches
- Prioritising sustainability, aligning with the RIBA 2030 Climate Challenge
See here for a PDF version of RIBA Plan of Work 2020: https://www.architecture.com/knowledge-and-resources/resources-landing-page/riba-plan-of-work
The RIBA Plan of Work 2020 template
Deep Dive into the RIBA Plan of Work 2020:
1. Stage Zero – Strategic Definition
- Purpose: Understand the client’s aspirations and explore all potential solutions.
- Key Activities:
- Client interaction
- Assessing project feasibility
- Analysing risks, budgets, and site appraisals
- Concluding with a final business case recommendation
Clogher Forest Village, new build home
2. Stage One – Preparation and Briefing
- Purpose: Set the project’s foundational blueprint.
- Key Activities:
- Establish the collaborative project team
- Conduct feasibility studies and site surveys
- Discuss potential constraints with local authorities
- Finalise project objectives, sustainability goals, and spatial requirements
3. Stage Two – Concept Design
- Purpose: Bring the project to life visually.
- Key Activities:
- Produce visualisations, 3D models, and drawings
- Incorporate landscaping, specific requests, and strategic engineering
- Review and refine design with stakeholders
Aerial view of Red Arches House in Kensal Rise, North West London, by RISE Design Studio
4. Stage Three – Spatial Co-ordination
- Purpose: Solidify the design’s practical elements.
- Key Activities:
- Design development using CAD or BIM
- Address practical design components, like locations of fixtures and material choices
- Finalise design for planning applications
5. Stage Four – Technical Design
- Purpose: Ensure the design is build-ready.
- Key Activities:
- Refine design with inputs from specialists
- Prepare comprehensive drawings and documents for tender
View of the kitchen in Douglas House in Kensal Rise, North West London, by RISE Design Studio
6. Stage Five – Manufacturing and Construction
- Purpose: Realise the architectural vision.
- Key Activities:
- Oversee construction per the schedule of works
- Act as a mediator between the client and contractor, ensuring alignment
7. Stage Six – Handover
- Purpose: Transition the project to the client.
- Key Activities:
- Conduct feedback and building aftercare exercises
- Address any defects or incomplete works
- Issue a final certificate upon project sign-off
View of kitchen and dining at Light House in Clapham, South London, by RISE Design Studio
8. Stage Seven – Use
- Purpose: Support the client in the building’s lifecycle.
- Key Activities:
- Provide advice on maintenance and energy management
- Gather feedback, especially concerning energy consumption
The Real Value of Engaging an Experienced Architect:
Choosing a qualified and experienced architect is vital for several reasons:
- Beware of Hidden Costs: Online architects may offer a cheaper initial design rate, but additional fees can soon add up. They might charge for every amendment or stage, and in the end, you could end up paying more than if you had chosen a traditional architect.
- Qualification Matters: In the UK, it takes seven years to become a qualified architect. Some individuals offer architectural services without these qualifications, calling themselves architectural designers or draughtsmen. It’s risky to trust such unqualified individuals. Just as you wouldn’t let an unqualified person perform a medical operation, architectural work requires expertise.
- Professional Standards and Insurance: A qualified architect, especially one chartered by RIBA, adheres to high standards. They have proper complaint procedures, serious consequences for professional misconduct, and the right insurance. Unqualified architects might not offer the same level of accountability.
- Expertise Ensures Feasibility: Paying a non-architect for design might seem cost-effective, but if their designs are flawed or unworkable, you’ll end up paying more to get them rectified by a qualified architect. This not only wastes money but also time and effort.
In short, it’s essential to choose an experienced and qualified architect to ensure the best outcome for your project without unnecessary costs or stress.
Conclusion:
The RIBA Plan of Work 2020 is more than a guide – it’s a compass that directs every stakeholder towards a unified vision, ensuring clarity, collaboration, and a successful project outcome.
During the construction stage at The Lexi Cinema & Hub in Kensal Rise, NW London
Frequently Asked Questions: RIBA Plan of Work 2020
- What is the RIBA Plan of Work 2020?
- The RIBA Plan of Work 2020 is a guidance document set out by the Royal Institute of British Architects, designed to serve as the definitive design and process management tool for the UK construction industry.
- Why was the RIBA Plan of Work established?
- It was first established in 1963 to provide architects with a framework to use on client projects, bringing clarity to each stage of the process. It has since evolved to become an industry-wide tool.
- What significant changes were made to the plan in 2020?
- In 2020, to reflect the evolving approaches to building design, advancements in digital technology, heightened ethical awareness, and the prioritisation of sustainable outcomes, the plan underwent its most comprehensive overhaul.
- How many stages are there in the RIBA Plan of Work 2020?
- There are eight key stages, each with its expected outcomes, core tasks, statutory processes, and vital information exchanges.
- What is the purpose of Stage Zero: Strategic Definition?
- Stage Zero is about understanding client requirements, shaping the business case, and considering whether a new building or other solutions such as refurbishment or extension best meet the client’s objectives.
- What is the main focus of Stage One: Preparation and Briefing?
- Stage One involves preparing a comprehensive project brief, selecting the project team, and finalising objectives like project outcomes, sustainability targets, and spatial requirements.
- What occurs during Stage Two: Concept Design?
- In Stage Two, the core design process starts, where visualisations, 3D models, and drawings of the architectural concept are produced in alignment with the project brief and cost plan.
- How does Stage Three: Spatial Coordination differ from Stage Four: Technical Design?
- Stage Three focuses on the developed design, integrating practical elements, while Stage Four finalises the design with detailed descriptions, preparing comprehensive drawings, specifications, and documents for tender.
- What activities take place in Stage Five: Manufacturing and Construction?
- The design process concludes, and the appointed contractor begins the on-site construction and any off-site manufacturing. Depending on the project’s scope, the client can appoint the design team as the contract administrator to oversee construction progress.
- What does the final Stage Seven: Use entail?
- As the building is occupied and operational, Stage Seven allows the client to seek advice on maintenance, energy consumption, or facility management. It makes the Plan of Work cyclical, allowing for feedback and leading back to Stage Zero when refurbishments or new builds are required.