Share this
RIBA Plan of Work 2020
by RISE Design Studio on Sep 5, 2022
RIBA Plan of Work 2020
Architects like most professions welcome industry led guidelines and approaches to inform and improve their work both for their clients, collaborators, and their own progression. The RIBA Plan of Work 2020 is a guidance document set out by the Royal Institute of British Architects (RIBA) and is seen as the definitive design and process management tool for the UK construction industry. First established in 1963 to provide a framework for architects to use on client projects to bring greater clarity to each stage of the process, it has evolved over the years to become an industry wide tool. To reflect the changing approaches to building design, construction and use, and the associated advances in digital technology, increased ethics awareness, and the prioritisation of sustainable outcomes in line with the RIBA 2030 Climate Challenge, it received its biggest overhaul in 2020. In this article we examine the eight stages of the RIBA Plan of Work 2020. We look at how this formal roadmap, whilst not a contractual document provides vital guidance and helps to deliver successful outcomes for stakeholders by informing the briefing, design, construction, handover, and use of a building. Each of the eight key stages has an expected outcome; core tasks; core statutory processes in relation to planning and building processes; and crucial information exchanges, all of which impact the success of the next stage.
Stage Zero – Strategic Definition ‘What do you want to achieve from your building project, and what are your best options?’ This stage is not about design or practical details, but rather a chance for us to get to know the client, developing their requirements and helping shape the business case to achieve them. At this stage all those involved in the client team, alongside ourselves and any other professional advisors must consider that the proposed building project is the appropriate means to meet the client’s stated objectives, and then determine the best way forward. For example, perhaps a new building is not the answer, and the solution could be refurbishment or an extension. To come to a decision, information is gathered for each option. This involves examining previous similar projects, the current building if applicable, analysis of project risk (where appropriate site appraisals and surveys carried out), and consideration of project budgets. We will look at the size, location, scope, and special considerations around the clients’ needs to further refine the vision. From this exercise a recommendation is made on the best option, and a business case is completed.
Stage One – Preparation and Briefing ‘Developing the initial project brief and setting out the timescales – the official start of the project’ Once it has been determined that the chosen project and site is the best way forward, stage one, is the process of preparing a comprehensive project brief and choosing the collaborative project team, allocating specific roles and responsibilities. The project team will include:
– Design team – headed up by Lead Designer and overseeing the design programme – Client team – headed up by Project Manager and overseeing the project programme – Construction team – headed up by Project Director and overseeing the construction programme
Feasibility studies and site surveys may be required at this stage to test the brief against the chosen site and budget i.e. are there any access issues? Is it a sloping site? What is the spatial overview and relationships with neighbouring buildings? This is often the time for us to discuss options regarding the site with the local planning authority and make sure there are no constraints. We like to establish clear and positive communication with these departments from the outset. Discussions around building regulations and other legal requirements should happen at this stage including whether the site is within a listed buildings or conservation area It is at this point that objectives are finalised and recorded under:– Project Outcomes – Sustainability Outcomes – Quality Aspirations – Spatial Requirements
Working with the client, we will at the end of this stage, produce a timescale for the project as well as a project execution plan setting out delivery.Stage Two – Concept Design ‘The design stages begin and the architectural concept is defined ‘ Stage two begins the core design process which culminates at stage four. We work closely at this stage with the client to produce visualisations, 3D models, and drawings of the architectural concept, ensuring it meets their needs and is aligned to the project brief and cost plan. As well as a visual representation of the building with sections and elevations and how it sits within the surrounding environment, these will often include:
– Interior and exterior renders – Landscaping – Specific requests – Strategic engineering requirements
There is as the RIBA states ‘no right or wrong approach’ at this point, it is our initial design response to the brief and will involve regular meetings, discussions and reviews with the client and specialist stakeholders including planners and those across structural and civil engineering, to shape and define it. The robust architectural concept along with the project brief and cost plan are signed off at the end of this stage. Stage Three – Spatial Co-ordination ‘The co-ordinated design takes form.’ Formerly the developed design stage, here our team draw up the client approved design in CAD or ever increasingly with BIM, and develop and test it alongside detailed structural design, outline specifications, building services and cost analysis to ensure its viability. Our design will incorporate the practical elements relating to:– Window, door, stairway, and fire exit locations – Fixtures, fittings – Proposed materials – Load bearing mechanical information – Mechanical, plumbing, and electrical considerations – Tech and security – Green, eco and solar
During this stage, or certainly at the end the design is finalised into a single model, not prone to change, and planning applications are ready for submission incorporating all our detailed drawings and reports. Stage Four – Technical Design ‘Final design stage before construction begins’ We make further refinements of the existing design at this stage, incorporating where relevant detail from specialist sub-contractors such as lighting specialists, kitchen designers or glazing companies. From this our Lead Architect prepares comprehensive drawings, specifications, and documents for tender. The level of detail will depend on the size and scope of the project but by the end of this stage all elements will be prescriptive rather than descriptive for the project to be manufactured and built, i.e., they set out detailed descriptions around the following:– Requirements relating to regulations and standards – The specific types of products and materials required – The methods of delivery and installation – The building systems in place i.e., flooring, partitions, mechanical and structural
At the end of this stage all information required to construct the project is completed and we send out the tender to 3-4 contractors we have worked with before. Of course, should the client want to add to the list we will do so. Stage Five – Manufacturing and Construction ‘All systems go…construction begins’ The design process is now complete and the appointed contractor takes possession of the site to carry out works as per the schedule of works and building contract. This includes manufacturing off-site and construction on-site. Stage four and stage five can overlap or run concurrently dependent on the size and scope of the project, or when the contractor was appointed. The client can choose to appoint us as the contract administrator at this point should they wish. In this role we act as the middle ground between the client and the contractor to ensure that all works are being done in accordance with finalised drawings and specifications. This can entail:– Chairing construction progress meetings – Preparing and issuing construction progress reports – Co-ordinating site inspections – Dealing with site queries – Agree reporting procedures for defects – Issuing project documentation to the client – Issuing certificates of completion
If appointed, we like to meet weekly with the client and the relevant parties to ensure that everything is running smoothly. The appointment of Building control by the client should take place, to oversee the project and ensure that all is in order in relation to the necessary construction standards. Health and Safety inspectors will review and observe the site at this stage, so it is worth considering an independent consultant to ensure that all the correct procedures are followed. Stage Six – Handover ‘The completed building is finished and handed over’ After practical completion, the building is ready for hand over to the client, and the building contract concludes. Feedback and building aftercare exercises take place during this stage to act as future learnings for ourselves, the client, contractor, and consultants, and to address any issues relating to the integrity of the building. These involve light touch post occupancy evaluation and snagging processes, whereby the client compiles a list of defects or incomplete works, overseen by us as the contracts administrator and presented to the contractor to rectify. They then have an agreed Defect Liability Period, usually six to twelve months to address these, after which if all has been made good, building control will sign off the construction and we will sign off the project as a whole. We then issue a final certificate, and this stage is complete. Stage Seven – Use ‘The vision for the building is realised and it is now in use’ This stage starts concurrently with stage six. The building is now occupied and in use. On most projects, our design team will have no duties to fulfil here. However, the incorporation of this stage into the RIBA Plan of Work 2020 gives the client the opportunity to get in touch with us if they require general advice relating to maintenance, energy consumption or management of the facilities. We welcome this communication as we love to hear how the client is finding their new building, and it also allows for effective aftercare, valuable feedback, and building monitoring especially around energy consumption, and is therefore key to the sustainability strategy. The addition of this feedback stage has made the Plan of Work cyclical as it unites the entire process into one, allowing for proper use of the building and then when demands change, and the building reaches an end of life where refurbishment or a new building may be needed, stage zero starts again. Embarking on a design and build project can often be a complex one for all involved, for a client it can be daunting. The RIBA Plan of Work 2020 offers all stakeholders a clear approach to map out the journey collaboratively from vision, through to design, construction and eventual use. At RISE Design Studios, we find that this straightforward process with realistic and measurable targets, the ability to review progress and a provision for valuable learnings allows for enhanced clarity, greater realisation of vision, and successful outcomes no matter the diversity of projects. For more information on the RIBA Plan of Work 2020 visit RIBA Plan of Work (architecture.com) If you would like to talk through your project with the team, please do get in touch at mail@risedesignstudio.co.uk or give us a call on 020 3290 1003.RISE Design Studio Architects company reg no: 08129708 VAT no: GB158316403 © RISE Design Studio. Trading since 2011.
Share this
- Architecture (144)
- Sustainable architecture (83)
- Design (66)
- Retrofit (55)
- Passivhaus (53)
- London (51)
- New build (48)
- Renovation (41)
- energy (38)
- interior design (37)
- Sustainable Design (33)
- Planning (32)
- Environment (31)
- Building materials (30)
- climate-change (29)
- Inspirational architects (27)
- Refurbishment (27)
- extensions (27)
- Building elements (22)
- Inspiration (21)
- Rise Projects (16)
- enerphit (16)
- net zero (13)
- Extension (12)
- General (12)
- Philosophy (12)
- Carbon Zero Homes (11)
- Working with an architect (10)
- architects (10)
- Awards (9)
- London Architecture (8)
- RIBA (8)
- architect (8)
- Innovative Architecture (7)
- Airtightness (6)
- Eenergy efficiency (6)
- Uncategorized (6)
- Virtual Reality (6)
- RISE Sketchbook Chronicles (5)
- Sustainable (5)
- cinema design (5)
- ARB (4)
- BIM (4)
- Basement Extensions (4)
- concrete (4)
- local materials (4)
- modular architecture (4)
- working from home (4)
- Carbon Positive Buildings (3)
- Home improvement (3)
- Passive house (3)
- Permitted development (3)
- Planning permission (3)
- Property (3)
- circular economy (3)
- construction (3)
- mvhr (3)
- natural materials (3)
- plywood (3)
- structural (3)
- structuralengineer (3)
- Artificial Intelligence (AI) (2)
- Bricks (2)
- Building in the Green Belt (2)
- Costs (2)
- Covid-19 (2)
- Heat Pumps (2)
- Home extensions (2)
- Permitted development rights (2)
- Roof extension (2)
- Welbeing (2)
- ashp (2)
- barcelona (2)
- building information modelling (2)
- co-working (2)
- design&build (2)
- furniture (2)
- glazed-extensions (2)
- green architecture (2)
- greenbelt (2)
- historic architecture (2)
- light (2)
- living space (2)
- london landmarks (2)
- londoncinemas (2)
- openingupworks (2)
- peter zumthor (2)
- rammed earth (2)
- self build (2)
- sustainability (2)
- sustainable building (2)
- traditional (2)
- trialpits (2)
- #NLANetZero (1)
- 3D Printing (1)
- 3D models (1)
- Adobe (1)
- Alvar (1)
- Architecture Interior Design (1)
- Area (1)
- Art (1)
- BIMx (1)
- BREEAM (1)
- Bespoke lighting (1)
- Birmingham Selfridges (1)
- Boat building (1)
- Boats (1)
- Brass (1)
- Brexit (1)
- Building energy (1)
- Casting (1)
- Chailey Brick (1)
- Chartered architect (1)
- Commercial Architecture (1)
- Copper (1)
- Czech Republic, (1)
- David Lea (1)
- Dormer extension (1)
- Ecohouse (1)
- Fees (1)
- Flooding (1)
- Furniture design (1)
- Gandhi memorial museum (1)
- Garden studio (1)
- Green Register (1)
- Green infrastructure (1)
- History (1)
- House cost (1)
- India (1)
- Jan Kaplický (1)
- Kitchen Design (1)
- L-shaped dormer (1)
- Land value (1)
- Loft conversion (1)
- Lord's Media Centre (1)
- Mapping (1)
- Marseilles (1)
- Mary Portas (1)
- Metal (1)
- Micro Generation (1)
- Monuments (1)
- Party Wall Surveyor (1)
- Place (1)
- Porch (1)
- Prefab (1)
- Procurement (1)
- Residential architecture (1)
- Richard Rogers (1)
- Sand (1)
- Scandinavian architecture (1)
- Selfbuild (1)
- Social Distancing (1)
- Social housing (1)
- Spain (1)
- Steel (1)
- Surveying (1)
- Sverre fehn (1)
- VR (1)
- West london (1)
- Wildlife (1)
- Wood (1)
- architect fees (1)
- architectural details (1)
- arne jacobsen (1)
- avant garde (1)
- backland (1)
- basements (1)
- brentdesignawards (1)
- building design (1)
- building regulations (1)
- built environment (1)
- carbonpositive (1)
- cement (1)
- charles correa (1)
- charles eames (1)
- charlie warde (1)
- charteredarchitect (1)
- climate (1)
- climate action (1)
- codes of practice (1)
- collaboration (1)
- constructioncosts (1)
- country house (1)
- countryside (1)
- covid (1)
- dezeenawards (1)
- drone (1)
- eco-living (1)
- emissions (1)
- epc (1)
- finnish architecture (1)
- foundations (1)
- futuristic (1)
- georgian architecture (1)
- glazed envelope (1)
- good working relationships (1)
- green building (1)
- hampstead (1)
- happiness (1)
- health and wellbeing (1)
- home extension (1)
- homesurveys (1)
- house extension (1)
- imperfection (1)
- independentcinemas (1)
- innovation (1)
- inspirational (1)
- insulation (1)
- interiorfinishes (1)
- internal windows (1)
- jean prouve (1)
- kindness economy (1)
- kintsugi (1)
- landscape architecture (1)
- lime (1)
- listed buildings (1)
- local (1)
- lockdown (1)
- low carbon (1)
- mansard (1)
- manufacturing (1)
- materiality (1)
- modern architecture (1)
- moderninst (1)
- modernism (1)
- moulded furniture (1)
- natural (1)
- natural cooling (1)
- natural light (1)
- nordic pavilion (1)
- northern ireland (1)
- palazzo (1)
- placemaking (1)
- planningpermission (1)
- plywood kitchen (1)
- post-Covid (1)
- poverty (1)
- powerhouse (1)
- preapp (1)
- preapplication (1)
- project management (1)
- ray eames (1)
- reclaimed bricks (1)
- recycle (1)
- renewable energy (1)
- reuse (1)
- ricardo bofill (1)
- rooflights (1)
- room reconfiguration (1)
- rural (1)
- satellite imagery (1)
- selfbuildhouse (1)
- shared spaces (1)
- site-progress (1)
- solarpvs (1)
- space (1)
- stone (1)
- structuralsurvey (1)
- sun tunnel (1)
- sustainable materials (1)
- terraces (1)
- thegreenregister (1)
- totality (1)
- wabi-sabi (1)
- waste (1)
- wooden furniture (1)
- zero waste (1)
- November 2024 (3)
- October 2024 (5)
- June 2024 (1)
- May 2024 (1)
- March 2024 (1)
- February 2024 (1)
- January 2024 (2)
- November 2023 (1)
- October 2023 (5)
- September 2023 (7)
- August 2023 (7)
- July 2023 (6)
- June 2023 (8)
- May 2023 (14)
- April 2023 (11)
- March 2023 (8)
- February 2023 (6)
- January 2023 (5)
- December 2022 (3)
- November 2022 (3)
- October 2022 (3)
- September 2022 (3)
- July 2022 (2)
- June 2022 (1)
- May 2022 (1)
- April 2022 (1)
- March 2022 (1)
- February 2022 (2)
- January 2022 (1)
- November 2021 (1)
- October 2021 (2)
- July 2021 (1)
- June 2021 (1)
- May 2021 (1)
- April 2021 (1)
- March 2021 (1)
- February 2021 (1)
- January 2021 (2)
- December 2020 (1)
- November 2020 (1)
- October 2020 (1)
- September 2020 (2)
- August 2020 (1)
- June 2020 (3)
- April 2020 (3)
- March 2020 (2)
- February 2020 (3)
- January 2020 (1)
- December 2019 (1)
- November 2019 (2)
- September 2019 (1)
- June 2019 (1)
- April 2019 (2)
- January 2019 (2)
- October 2018 (1)
- September 2018 (1)
- August 2018 (2)
- July 2018 (1)
- March 2018 (1)
- February 2018 (2)
- December 2017 (1)
- September 2017 (1)
- May 2017 (1)
- January 2017 (1)
- December 2016 (1)
- November 2016 (1)
- September 2016 (1)
- August 2016 (2)
- June 2016 (2)
- May 2016 (1)
- April 2016 (1)
- December 2015 (1)
- October 2015 (1)
- September 2015 (1)
- August 2015 (1)
- June 2015 (1)
- January 2015 (1)
- September 2014 (2)
- August 2014 (1)
- July 2014 (4)
- June 2014 (9)
- May 2014 (2)
- April 2014 (1)
- March 2014 (1)
- February 2014 (1)
- December 2013 (1)
- November 2013 (5)
- October 2013 (5)
- September 2013 (5)
- August 2013 (5)
- July 2013 (5)
- June 2013 (2)
- May 2013 (2)
- April 2013 (4)
- March 2013 (5)
- February 2013 (2)
- January 2013 (3)